Goliath’s (GOT.V): Seventh Drill Hole Intersects 48.2 Meters* of Extensive Quartz-Sulphides Veining, ~600 Meters North of Cliff Pad Surebet Zone, Golden Triangle B.C.

All Seven drill holes completed to date have intersected significant widths of veining and sulphides demonstrating the robust nature of this mineralized system at the Surebet Polymetallic Gold-Silver Zone. Following the successful first drill hole from the North Showing drill pad (GD21-006, 195 meters, 030⁰/-62⁰)...
Continue reading »

Goliath (GOT.V): Adds Second Drill Based on Extensive Mineralization Observed From First 5 Holes, Drilling Is Now Underway at Sixth Hole (GD21-006) ~600 Meters Along Strike at the North Showing Surebet, Golden Triangle B.C.

All five drill holes completed to date have intersected significant widths of veining and sulphides demonstrating the robust nature of this mineralized system at the Surebet Polymetallic Gold-Silver Zone. Rush assays are expected in the immediate future for GD21-001. A second drill has been added...
Continue reading »

Goliath (GOT.V): Drills 67.1 Meters of Quartz-Sulphide Veining, Brecciation and Associated Alteration in Fourth Drill Hole (GD21-004) at the Surebet Zone, Golden Triangle B.C.

One hundred percent of the drill holes completed to date have intersected significant widths of veining and sulphides demonstrating the robust nature of this extensive mineralizing Polymetallic gold-silver discovery. The fourth drill hole (GD21-004) from the Cliff Showing drill pad, intersected 67.1 meters* of quartz-sulphide...
Continue reading »

Goliath (GOT.V): Intersects 78 Meters of Quartz-Sulphide Veining, Brecciation and Associated Alteration in Third Drill Hole (Gd21-003) at the Surebet Zone, Golden Triangle B.C.

The third drill hole, GD21-003 (165 m, 220°/-70°) intersected 78.0 meters* of quartz-sulphide veining, brecciation and associated alteration from 49.0 to 127.0 meters (link to images); The 53.5 meter* interval from 49.0 m to 102.5 m is similar in appearance to the mineralized intercepts of...
Continue reading »

Goliath (GOT.V): Intersects 23 Meters of Quartz-Sulphide Veining in Second Hole Similar to the 57.5 Meters Drilled at the First Hole Surebet Zone, Golden Triangle B.C.

The second drill hole, GD21-002 (planned 350 meters in length, 050°/-55°) intersected 23 meters* of quartz-sulphide veining and breccia, enveloping 5.6 meters* and 0.7 meters* of intense quartz-sulphide vein breccias (link to images). The upper 5.6 meters* vein breccia contains >80% quartz, pyrrhotite (magnetic iron sulphide), sphalerite...
Continue reading »

Goliath (GOT.V): Drills Significant Quartz-Sulphide Veining Over 57.5 Meters* in Inaugural Drill Hole on the Surebet Zone, Golden Triangle B.C.

Highlights: The inaugural drill hole GD21-001 (138 meters in length, 140°/-70°) at the Surebet Zone intersected 57.5 meters* of quartz-sulphide veins bound by two distinct and significant multi-meter-scale quartz-sulphide stockwork breccia (link to images). The 3.4 meters* upper vein contains visually estimated 10% centimeter-scale banded,...
Continue reading »

Goliath (GOT.V): Completes Geophysical Survey on Extensive High-Grade Gold-Silver Surebet Zone Discovery, Golden Triangle, BC

TORONTO, June 22, 2021 (GLOBE NEWSWIRE) — Goliath Resources Ltd. (TSX-V: GOT) (FSE: B4IF) (OTCQB: GOTRF) (the “Company or “Goliath”); Goliath is pleased to announce a high-resolution geophysical survey was completed, covering a 16 square kilometer area including and surrounding the Surebet Zone which is a...
Continue reading »