Goliath (GOT.V): Drills 21.72 Meters* of Quartz-Sulphides Veining and Brecciation 1,000 Meters Down Dip From the Northeast Showing at Surebet Zone, Golden Triangle B.C.

All 24 completed drill holes drilled intersected significant widths of quartz-sulphides veining demonstrating the robust nature of the Surebet Polymetallic Gold-Silver Zone (“Surebet”) that remains open both along strike and to depth. A total of 5,332 meters were drilled in the maiden 2021 drill campaign...
Continue reading »

Goliath (GOT.V): Drills 32.6 Meters* of Extensive Quartz-Sulphide Mineralization From the Waterfall Showing at Surebet Zone, Golden Triangle B.C.

All 23 diamond drill holes completed to date totaling 4,391 meters have intersected significant widths of quartz-sulphides veining along the entire 1,000 meters strike length demonstrating the robust nature of the Surebet polymetallic Gold-Silver Zone that remains open both along strike and to depth. At...
Continue reading »

Goliath (GOT.V): Drills 35.72 Meters* Grading 6.37 g/t Gold Equivalent (4.46 g/t Au and 122.13 g/t Ag) at Surebet High-Grade Gold-Silver Discovery, Golden Triangle B.C.

Assay results from the third hole (GD21-003) intercepted Surebet Zone’s polymetallic quartz-sulphide vein system demonstrate an impressive 35.72 meters* of quartz-sulphide breccia and surrounding quartz-sulphide stockwork containing a weighted average of 6.37 g/t gold equivalent (AuEq) or 4.46 g/t Au and 122.13 g/t Ag. Higher...
Continue reading »

Goliath’s (GOT.V): Seventh Drill Hole Intersects 48.2 Meters* of Extensive Quartz-Sulphides Veining, ~600 Meters North of Cliff Pad Surebet Zone, Golden Triangle B.C.

All Seven drill holes completed to date have intersected significant widths of veining and sulphides demonstrating the robust nature of this mineralized system at the Surebet Polymetallic Gold-Silver Zone. Following the successful first drill hole from the North Showing drill pad (GD21-006, 195 meters, 030⁰/-62⁰)...
Continue reading »

Goliath (GOT.V): Intersects 61.5 Meter* Zone Containing Quartz-Sulphides Veining at Sixth Hole ~600 Meter Step Out to the North From Cliff Pad Along Strike, Surebet Zone Golden Triangle B.C.

The first drill hole from the North pad, GD21-006 (completed @ 195 meters, 060⁰/-62⁰) and intersected 61.5 meters* of quartz-sulphides (galena, pyrrhotite, sphalerite, chalcopyrite) veining, brecciation and alteration from 72.0 to 133.5 meters downhole length. Based on Portable XRF readings returned up to 326 g/t...
Continue reading »

Goliath (GOT.V): Adds Second Drill Based on Extensive Mineralization Observed From First 5 Holes, Drilling Is Now Underway at Sixth Hole (GD21-006) ~600 Meters Along Strike at the North Showing Surebet, Golden Triangle B.C.

All five drill holes completed to date have intersected significant widths of veining and sulphides demonstrating the robust nature of this mineralized system at the Surebet Polymetallic Gold-Silver Zone. Rush assays are expected in the immediate future for GD21-001. A second drill has been added...
Continue reading »

Goliath (GOT.V): Drills 67.1 Meters of Quartz-Sulphide Veining, Brecciation and Associated Alteration in Fourth Drill Hole (GD21-004) at the Surebet Zone, Golden Triangle B.C.

One hundred percent of the drill holes completed to date have intersected significant widths of veining and sulphides demonstrating the robust nature of this extensive mineralizing Polymetallic gold-silver discovery. The fourth drill hole (GD21-004) from the Cliff Showing drill pad, intersected 67.1 meters* of quartz-sulphide...
Continue reading »

Goliath (GOT.V): Intersects 78 Meters of Quartz-Sulphide Veining, Brecciation and Associated Alteration in Third Drill Hole (Gd21-003) at the Surebet Zone, Golden Triangle B.C.

The third drill hole, GD21-003 (165 m, 220°/-70°) intersected 78.0 meters* of quartz-sulphide veining, brecciation and associated alteration from 49.0 to 127.0 meters (link to images); The 53.5 meter* interval from 49.0 m to 102.5 m is similar in appearance to the mineralized intercepts of...
Continue reading »