Eloro Resources (ELO.V): Intersects 160.00 g Ag eq/t (27.37g Ag/t, 0.62% Zn, 0.52% Pb and 0.11% Sn) over 251.87m and 133.45 g Ag eq/t (19.10g Ag/t, 0.20 g Au/t, 0.42% Zn, 0.64% Pb and 0.08% Sn) over 289.45m in the Santa Barbara Target area at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Eloro Resources
These new drill results combined with previously released drill results for the underground drilling are defining a potential major feeder structure for the Ag-Sn polymetallic mineralization in the Santa Barbara Adit area. Bore Hole Induced Polarization (BHIP) surveys to a depth of almost 1,000m indicates...
Continue reading »

Eloro Resources Intersects 169.11 g Ag eq/t (64.30 g Ag/t, 0.96% Zn, 0.37% Pb and 0.07% Sn) over 235.55m to further Expand Higher Grade area to the North in the Eastern Part of the Santa Barbara Target at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Eloro Resources
Includes a higher-grade section in this underground hole DSBU-06 (Azimuth 00 and dip -650) of 314.52 g Ag eq/t (192.18g Ag/t, 0.22 g Au/t, 0.07% Zn, 0.41% Pb, and 0.11% Sn) over 50.68m and an additional intersection of 110.57 g Ag eq/t (17.38 g Ag/t, 0.09 g Au/t, 0.30% Zn, 0.21% Pb...
Continue reading »