Eloro Resources Announces Robust Initial Inferred Mineral Resource Estimate of 670 million tonnes containing 1.15 Billion In-situ Ounces Silver Equivalent for Iska Iska Project, Potosi Department, Southwestern Bolivia

Eloro Resources
Total in situ metal estimated to be 298 million ounces Ag, 4.09 million tonnes Zn, 1.74 million tonnes Pb and 130,000 tonnes Sn totalling 1.15 billion ounces silver equivalent. Due to the multi-metal nature of the deposit, the resources are reported using Net Smelter Return (NSR)...
Continue reading »

Eloro Resources intersects Significant Tin Mineralization (0.17% Sn over 52.75m) in Mina Casiterita Property and also Receives Strong Results from Infill Holes at Santa Barbara Deposit, Potosi Department, Bolivia

Eloro Resources
Eloro Resources intersects Significant Tin Mineralization (0.17% Sn over 52.75m) in Mina Casiterita Property and also Receives Strong Results from Infill Holes at Santa Barbara Deposit, Potosi Department, Bolivia Tin mineralization at Casiterita is located 2km southwest of the Santa Barbara deposit indicating that the...
Continue reading »

Eloro Resources’ drill hole DSB-47 intersects 114g Ag eq/t (9.90g Ag/t, 0.12 g Au/t, 0.96% Zn, and 0.68% Pb) over 320.97m in the Santa Barbara High-Grade Zone, at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Eloro Resources
Holes DSB-50, DSB-51 and DSB-52, the southernmost holes that tested the potential south-southeastern extension of the High-Grade Zone at Santa Barbara, each returned well mineralized intersections over 100m core length as follows: 86.67g Ag eq/t (13.57g Ag/t, 0.99% Zn and 0.41% Pb) over 105.42m including 193.50 g Ag eq/t (15.34g...
Continue reading »

Eloro Resources Provides Update on the Ongoing Preliminary Metallurgical Testwork Program for the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Eloro Resources
TORONTO, April 04, 2023 (GLOBE NEWSWIRE) — Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its ongoing preliminary metallurgical testwork program for the Iska Iska silver-tin polymetallic project (the “Project”) in the Potosi Department, southern...
Continue reading »