Carter explains what drove Cabral Gold’s share price over the past 12 months: building and commissioning the Stage 1 mine at the Cuiú Cuiú Gold Project in Brazil, with first gold poured on 10 September, on budget and two months ahead of schedule, and commercial production then expected to be declared in the coming weeks. He outlines the updated resource estimate then in preparation — the first since September 2022, when three deposits totalled 1.2 million ounces indicated and inferred — now modelling six gold deposits after 50,000 metres of drilling, with standout results including 9.5 metres at 87.4 grams per tonne gold. Alan describes Cuiú Cuiú as an entire district, with six deposits found so far and 50 peripheral targets, and the plan to double Stage 1 throughput from 3,000 to 5,000–6,000 tonnes per day by Q3 2027, ahead of a much larger Phase 2 hard-rock mine targeting 12,000–15,000 tonnes per day, with a PEA expected by Q3 2027. Alan also notes a cash balance of about C$68 million, his own C$2 million personal investment in the company, and a strategic shareholder, Alpayana, which took a 9.99% stake in August 2026.

Leave a Reply

Your email address will not be published. Required fields are marked *

Name *
Email *
Website