In Q1 2025, 116 BoT/ToB holes were completed at Harpsund and Brokojan. At Harpsund, drilling targeted the strongest part of the gold anomaly located within the axis of the fold hinge and the intersection of the fold axis and second order splay structure. Gold results were generally anomalous with bedrock results up to 0.18 ppm gold and sample results > 0.1 ppm in 13 locations, forming a cohesive gold-in-bedrock anomaly. For regional context, values of 0.1 ppm or higher in bedrock are considered highly anomalous and thus important for the discovery of gold mineralization.

Large areas of the gold-in-till anomaly along the axis of the fold to the NE in the up-ice direction were not drilled due access limitations in steep and challenging ground conditions; due to this, a large portion of the target area along the axis of the fold was not adequately tested in the drilling program and results encountered are potentially outside the main source of the anomaly. In addition, due to ground conditions sloping steeply to the northeast, it is possible that the till anomaly has been transposed slightly from the original location. The results are considered highly encouraging, and follow-up diamond drilling over the 2 km target area is planned for the second half of 2025, following programs at other priority targets along the Gold Line belt. Access was significantly limited at the Brokojan target due to several factors including unusually mild winter conditions resulting in partially frozen swamp areas, and steep ground conditions. The main target area at Brokojan was not tested as a result and will be targeted with a follow up campaign of BoT/ToB in H2 2025 when conditions allow.

Figure 1: Harpsund/Brokojan target area showing results from the 2025 gold-in-till analysis and ToB/BoT drilling. (CNW Group/First Nordic Metals Corp.)

About the Harpsund and Brokojan Targets
The Harpsund and Brokojan targets are located within the Paubäcken Project area of the Gold Line belt in northern Sweden. Both target areas are located on a northwest trending second order splay structure off the main regional Gold Line belt structure. The Brokojan target is located at the intersection of first and second order structures, and the Harpsund target within a large flexure and/or fold hinge along the structure. The geology consists of a sequence of inverted basin sediments and mafic volcanic rocks intruded by small syn-kinematic granitic intrusions within a broad, anastomosing high strain structural corridor. These lithological sequences are highly prospective for orogenic gold deposits.

About the Paubäcken Project
The Paubäcken project covers 17,097 hectares across three licenses in the heart of northern Sweden’s emerging “Gold Line belt”. The belt hosts several significant gold deposits, including the Company’s nearby Barsele project as well as the Svartliden mine and Fäboliden development project, operated by Dragon Mining Ltd.

ABOUT FIRST NORDIC METALS
First Nordic Metals Corp. (FNM) is a Canadian-based gold exploration company, consolidating assets in Sweden and Finland, with a vision to create Europe’s next gold camp. The Company’s flagship asset is the Barsele gold project in northern Sweden, a joint venture project with senior gold producer Agnico Eagle Mines Limited. Immediately surrounding the Barsele project, FNM is 100%-owner of a district-scale license position comprised of two additional project areas (Paubäcken, Storjuktan), which combined with the Barsele project, total ~100 km of strike coverage of the Gold Line greenstone belt. Additionally, in northern Finland, FNM is the 100%-owner of a district-scale position covering the entire underexplored Oijärvi greenstone belt, including the Kylmäkangas deposit, the largest known gold occurrence on this belt.

ON BEHALF OF THE BOARD OF DIRECTORS
Taj Singh, M.Eng, P.Eng, CPA
CEO & Director

For further information contact:
Marie Macdonald, Investor Relations, Phone: 604-687-8566, Email: [email protected]

Follow First Nordic Metals:
Twitter: @fnmetals |  Youtube: @firstnordicmetalscorp  |  LinkedIn: @firstnordicmetals
Facebook: @FirstNordicMetals |  Instagram: @firstnordicmetals

Qualified Person & QA/QC
Benjamin Gelber, P. Geo., Exploration Head of FNM, is the Qualified Person as defined in NI 43-101, and takes responsibility for the technical disclosure contained within this news release.

ToB/BoT samples
All 2025 BoT/ToB samples were collected under the supervision of EMX Royalty Corporation employees. Till and bedrock samples were transported from the drilling locations where it was bagged to the EMX office facility located in Malå, northern Sweden where it was logged. Sample reference materials were inserted at regular sample intervals. Groups of samples were placed in large bags and sealed with numbered tags to maintain a chain-of-custody and transported to the ALS Laboratory prep lab in Piteå. Samples were transported by ALS Laboratories to ALS in Loughrea, Ireland.

Samples from the till part of the program where prepared with PREP-41 in Pitea. Samples where dried (<60°C) and sieved (-180µm (80mesh)) and subsequently 25 g of the fine fraction were analysed for Gold using the ALS AuME-ST43 package with a cyanide and aqua regia digestion and ICP-MS finish.

Samples from the bedrock were separated in the lower 1.5 m sample interval, where individual samples were crushed to 2 mm (10 mesh) and a 250 g split was pulverized to 75 μm (200 mesh) for analysis (PREP-31Y) and analysed with a complete characterization package CCP-PKG01 combined with PGM-ICP23 for precious metals analysis.

The assay package for the complete characterization combines a total carbon analysis (C-IR07), a multi element with ME-4ACD81 four acid digestion and ICP-AES finish for base metals, a major element analysis using ME-ICP06 with a fusion digestion and an ICP-AES finish, ME-MS42 with an Aqua Regia digestion and an ICP-MS finish for more volatile elements, ME-MS81 for refractory elements using a Li-Borate fusion digestion and ICP-MS finish, and sulfur content by induction furnace (S-IR08). If a second bedrock sample could be taken, the upper 1.5 m were analysed for gold only using ALS method PGM-ICP23 where a 30 g split is analyzed with fire assay by Pb collection and AAS finish.

Surface till samples
Sample reference materials were inserted at regular sample intervals. Samples were measured for gold pathfinder elements at the EMX facility via x-ray fluorescence (XRF). Based on the XRF results a subset of samples is then sent to MEFFA Labs Oy in Finland, where samples are prepared by fine fraction separation in a wet sieving process and subsequently analyzed by laser ablation ICP-MS for gold.

Cautionary Note Regarding Forward-Looking Statements:

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This News Release contains forward-looking statements, including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements and FNM undertakes no obligation to update such statements, except as required by law.

First Nordic Metals (CNW Group/First Nordic Metals Corp.)

SOURCE First Nordic Metals Corp.

 

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/May2025/29/c7936.html

Leave a Reply

Your email address will not be published. Required fields are marked *

Name *
Email *
Website